Skip to content

Guide

UAD 3.6 and the New URAR: What Changes for Square Footage

What the redesigned appraisal report (UAD 3.6) changes about reporting gross living area, levels and below-grade space, and when it's required.

Updated · FloorFigures

Short answer

UAD 3.6 and the redesigned URAR are mandatory for new appraisal reports first submitted to UCDP on or after November 2, 2026. Square footage is no longer one GLA box: it goes into six ANSI Z765 area fields (finished and unfinished, above and below grade, plus "nonstandard" finished area above and below grade), and each ADU gets its own breakdown.

The redesigned appraisal report retires forms appraisers have used for years, and square footage is where many will feel it first. The measuring rules haven't changed: it's still ANSI Z765-2021. What changes is where each piece of area goes. This page covers the dates, the six fields, nonstandard area, ADUs and what to change in your workflow.

What is UAD 3.6?

The Uniform Appraisal Dataset (UAD) is the standard set of data that Fannie Mae and Freddie Mac require in appraisal reports. Version 3.6 aligns it with the MISMO 3.6 data standard and comes with a redesigned Uniform Residential Appraisal Report (URAR). Instead of a set of fixed forms, the URAR is, in Freddie Mac's words, "a single data-driven, flexible, dynamic structure", where "the data that describes the subject property drives the appraisal report, not a form type or number."

It retires the familiar forms, including:

  • Uniform Residential Appraisal Report (1004 / 70), with its desktop and hybrid versions
  • Individual Condominium Unit Appraisal Report (1073 / 465) and exterior-only 1075 / 466
  • Exterior-Only Inspection Residential Appraisal Report (2055)
  • Individual Cooperative Interest Appraisal Report (2090)
  • 1004C / 70B, 1025 / 72, 1007 / 1000 and 1004D / 442

The GSEs say UAD 3.6 also supports FHA, VA and USDA requirements; each agency sets its own implementation plan.

When is UAD 3.6 required?

DateMilestone
September 8, 2025Limited production begins
January 26, 2026Broad production begins
June 23, 2026Fannie Mae and Freddie Mac publish the UAD ANSI reporting job aid
September 30, 2026One-time temporary policy exception announced for lenders that can't meet the date
November 2, 2026Mandatory for new reports first submitted to UCDP on or after this date
May 19, 2027Last day lenders with an exception can submit new UAD 2.6 reports

The date that matters is the UCDP submission date. Freddie Mac's FAQ says the mandate "is based on the UCDP Submission Date, not the Loan Application or Effective Date." An appraisal inspected on October 28, 2026 and first submitted on November 3 needs to be a UAD 3.6 report, unless the lender holds an exception.

The six area fields

These replace the single GLA figure. Each is a total in square feet for the dwelling, measured under ANSI Z765-2021. Fields that don't apply are reported as 0.

UAD 3.6 area fields
FieldWhat goes in itTypical examples
Finished Above GradeFinished area on levels entirely above grade that meets ANSI's ceiling-height and connection rules. This is what GLA was.Main floor, second floor, a finished bonus room with a proper ceiling and a finished stair to it
Finished Above Grade (Nonstandard)Finished above-grade area that fails the ceiling-height rules or is reached only through unfinished spaceSloped attic room less than half at 7 ft; finished room over the garage reached through the garage
Unfinished Above GradeArea on above-grade levels that isn't finished like the rest of the houseUnfinished bonus room or storage area inside the house
Finished Below GradeFinished area on levels wholly or partly below grade that meets the ceiling rulesFinished basement, finished walkout level
Finished Below Grade (Nonstandard)Finished below-grade area that fails the ceiling-height rules or is reached through unfinished spaceFinished basement area under a low ceiling
Unfinished Below GradeUnfinished area on below-grade levelsUnfinished basement, mechanical and storage areas

Two things are not in the six fields. Garages: in the GSEs' job aid, a house with a 400 sq ft attached garage reports 0 sq ft of Unfinished Above Grade. And ADUs, which get their own breakdown (below). Porches, decks and openings to the floor below stay out, as they always have under ANSI.

Worked examples from the GSE job aid

Three of the examples Fannie Mae and Freddie Mac published, each a house with 1,500 sq ft on the main level:

FieldPartly finished basementBasement with low ceilingsSloped second floor
Finished Above Grade1,5001,5001,500
Finished Above Grade (Nonstandard)001,000
Unfinished Above Grade000
Finished Below Grade1,2009000
Finished Below Grade (Nonstandard)06000
Unfinished Below Grade30000
  • Partly finished basement: 1,200 of the 1,500 sq ft basement is finished with ceilings of 7 ft or more; the other 300 sq ft is unfinished.
  • Basement with low ceilings: the whole basement is finished, but 600 sq ft of it has ceilings under 7 ft, so that part is nonstandard.
  • Sloped second floor: 600 of its 1,000 sq ft is under 7 ft (but over 5 ft) and only 400 sq ft reaches 7 ft. Less than half meets the height, so the whole 1,000 sq ft is nonstandard.

Nonstandard and noncontinuous areas

"Nonstandard finished area" is Fannie Mae's term for finished space that doesn't qualify as finished square footage under ANSI: it fails the ceiling-height rules (7 ft, 6 ft 4 in under beams and ducts, the sloped-ceiling half rule) or it's reached through unfinished space. Fannie Mae asks appraisers to:

  • calculate it and report it separately (now in the two Nonstandard fields),
  • explain why it doesn't comply,
  • acknowledge any contribution it makes to value, and
  • include above-grade nonstandard rooms in the room count.

Noncontinuous finished area is different: attached finished space that isn't an ADU and has no interior access to the house. Fannie Mae has it reported on its own line in the sales comparison grid. For the ceiling rules in detail, see ceiling height rules.

How are ADUs reported?

The redesigned report counts units first: Units Excluding ADUs, Accessory Dwelling Units and the levels in each. Each ADU then gets its own area breakdown with the same six fields, and its ingress/egress is recorded as interior/exterior access or exterior only access. Freddie Mac describes the URAR as collecting "more detailed information about ADUs, such as size, condition, rooms, and location."

DwellingAttached ADU
Finished Above Grade1,291 sq ft728 sq ft
Other five fields00
AccessInterior/exterior, or exterior only

That is the job aid's example: the ADU's 728 sq ft is reported in its own breakdown, never added to the house's 1,291 sq ft.

What should appraisers change in their workflow?

  1. Confirm the format on every order until May 19, 2027, since some lenders may still be on UAD 2.6 under the exception.
  2. Classify every area in the field by three questions: finished or unfinished, above or below grade, standard or nonstandard. A walkout level is below grade; a garage is never finished.
  3. Measure ceiling heights, not just floor dimensions. In sloped rooms, note where the ceiling crosses 7 ft and 5 ft so you can apply the half rule.
  4. Note how each finished area is reached. A finished connection makes it standard; access only through a garage or unfinished attic makes it nonstandard.
  5. Identify ADUs and their access, and keep their area out of the main dwelling's figures.
  6. Check your sketch software produces the six-field and ADU breakdowns from the sketch, and that its output follows ANSI. Fannie Mae holds sketch and 3D-scan output to the standard.
  7. Add the declaration when figures come from plans, an exterior-only measurement or estimates. Fannie Mae expects full ANSI compliance since the GXX001 code was retired.

Getting the figures from a floor plan

For desktop work or checking a third-party plan, FloorFigures measures a PDF or image of the plan for free and keeps the categories apart: above-grade finished, below-grade finished, garage and unfinished areas, with openings to below subtracted, the ceiling-height rules applied and totals rounded to the whole square foot. It doesn't fill UAD forms; you carry the figures into the matching fields. See how to calculate GLA for a full worked example.

Sources

Questions

When is UAD 3.6 mandatory?
UAD 3.6 and the redesigned URAR are mandatory for new appraisal reports first submitted to the Uniform Collateral Data Portal (UCDP) on or after November 2, 2026. The trigger is the UCDP submission date, not the appraisal's effective date or the loan application date. Lenders that can't meet the date can request a one-time temporary exception from Fannie Mae and Freddie Mac that allows new UAD 2.6 submissions through May 19, 2027.
Is GLA still reported on the new URAR?
Not as one figure. The redesigned URAR replaces the single gross living area box with six ANSI-based area fields: Finished Above Grade, Finished Above Grade (Nonstandard), Unfinished Above Grade, Finished Below Grade, Finished Below Grade (Nonstandard) and Unfinished Below Grade. The figure appraisers used to call GLA is reported as Finished Above Grade.
What is Finished Above Grade (Nonstandard)?
It is finished space on an above-grade level that doesn't meet ANSI Z765's rules for finished square footage, usually because the ceiling is too low (under 7 ft, or a sloped room where less than half reaches 7 ft) or because it is reached only through unfinished space. In the GSEs' job aid, a 1,000 sq ft second floor with sloped ceilings where only 400 sq ft reaches 7 ft is reported entirely as Finished Above Grade (Nonstandard).
How are ADUs reported in UAD 3.6?
Separately from the main house. The report records the number of units excluding ADUs and the number of accessory dwelling units, and each ADU gets its own area breakdown using the same six fields, plus its access: interior/exterior access or exterior only. In the GSEs' example, a 1,291 sq ft house with a 728 sq ft attached ADU reports 1,291 sq ft Finished Above Grade for the dwelling and 728 sq ft for the ADU, not 2,019 sq ft combined.
Was the UAD 3.6 deadline extended?
No. The November 2, 2026 mandatory date did not change. On September 30, 2026, Fannie Mae and Freddie Mac announced a one-time temporary policy exception: lenders that can't implement UAD 3.6 in time can request it from each agency they sell to and keep submitting UAD 2.6 reports through May 19, 2027. Appraisers don't request the exception; their lender clients do.
Where does the garage go on the UAD 3.6 report?
Not in the six area fields. In the Fannie Mae and Freddie Mac job aid, a house with a 400 sq ft attached garage and an unfinished basement shows 0 sq ft of Unfinished Above Grade area: the garage is not part of the area breakdown. Under ANSI Z765 a garage is never finished area.

Measure your own plan.

Open a PDF, image or photo of the plan. FloorFigures finds the scale and the rooms and does the math. $10 once, for life, and nothing is uploaded.

Related